Setia Eco Templer, Rawang, Selangor · By S P Setia
Bali-inspired 2-storey Semi-D Homes and Link Villas set beside Templer Park — the second residential phase of Gaia Gardens within the wider Setia Eco Templer township, built around a resort concept of legendary creeks and tropical gardens.
1 / 6
Developer
S P Setia
Property type
Semi-D & Link Villa
Tenure
Leasehold (to 2116)
Status
Under construction
Completion
Est Q1 2026
Jimbaran @ Gaia Gardens is the second residential phase of Gaia Gardens within Setia Eco Templer — S P Setia's "Legend of Nine Creeks" township in Rawang, built around legendary creeks, tropical gardens and a resort-living concept drawn from the island of Bali. The phase offers two 2-storey landed types: Semi-D Homes on a 32' x 80' lot with roughly 2,780 sq ft build-up and 4 bedrooms plus 4 bathrooms, and Link Villas on a 20' x 80' lot with 2,230–2,540 sq ft build-up and 4 bedrooms plus 3 bathrooms.
The development's shared spaces lean into the Bali theme — a Gapura Candi Bentar-style stone gateway welcomes residents into Angkul Garden, while a spiral viewing tower overlooks a lake at Amantara, with Balinese thematic gardens woven throughout the common areas. Setia Eco Templer as a whole sits directly beside Templer Park, with its own dedicated flyover for direct highway access.
Both house types are reinforced concrete construction with brick walls, aluminium-framed glass windows and timber doors to bedrooms, with porcelain tile flooring throughout the ground floor and timber or laminate flooring upstairs. Semi-D units get a centralised solar water heater system; both types come wired for 3-phase power and data/telephone points.
| Type | Size | Layout | Lot |
|---|---|---|---|
| Semi-D Home | Approx. 2,780 sq ft | 4 bedrooms, 4 bathrooms, 2-storey | 32' x 80' |
| Link Villa (Intermediate) | Approx. 2,230 sq ft | 4 bedrooms, 3 bathrooms, 2-storey | 20' x 80' |
| Link Villa (End / Corner) | 2,320–2,540 sq ft | 4 bedrooms, 3 bathrooms, 2-storey | 20' x 80' |
Semi-D Homes are priced from RM1,993,000 to RM2,125,000 gross, from RM683 gross per sq ft, per the developer's sales package. Maintenance is estimated at RM0.20 psf based on land size. Link Villa pricing is not yet confirmed in the current sales package — WhatsApp Joey for the latest confirmed price list, unit availability and lot position.
Jimbaran @ Gaia Gardens sits within Setia Eco Templer at Jalan Ipoh-Rawang, KM-20, Taman Rekreasi Templer, directly beside Templer Park and served by a dedicated Setia Eco Templer Flyover onto the KL-Kuala Selangor Expressway (LATAR), with the Guthrie Corridor Expressway and North-South Expressway also reachable. Rawang KTM Station is about 3km away, with Institut Kraf Negara (2km) and Templer Park International School (3km) both close by. Lotus's Rawang is roughly 3km out, with Jusco Rawang around 15km and KL City Centre about 25km away.
Jimbaran @ Gaia Gardens is developed by Setia Eco Templer Sdn Bhd (201201036071), part of S P Setia's broader township portfolio. Land is held on a 99-year leasehold title expiring 4 October 2116, under the jurisdiction of Majlis Perbandaran Selangor (MPS).
Jimbaran @ Gaia Gardens sits within the Setia Eco Templer township at Jalan Ipoh-Rawang, KM-20, Taman Rekreasi Templer, Rawang, Selangor — beside Templer Park and the Setia Eco Templer Flyover, with access to the KL-Kuala Selangor Expressway (LATAR) and Guthrie Corridor Expressway.
Jimbaran @ Gaia Gardens is developed by Setia Eco Templer Sdn Bhd (201201036071), part of S P Setia's township portfolio.
Jimbaran @ Gaia Gardens is a 99-year leasehold development, with the lease expiring 4 October 2116.
Two 2-storey landed types: Semi-D Homes on a 32' x 80' lot with approximately 2,780 sq ft build-up and 4 bedrooms plus 4 bathrooms, and Link Villas on a 20' x 80' lot with 2,230–2,540 sq ft build-up and 4 bedrooms plus 3 bathrooms.
The Semi-D Homes are priced from RM1,993,000 to RM2,125,000 gross, from RM683 gross per sq ft, per the developer's sales package. WhatsApp Joey for current Link Villa pricing and availability.
Estimated completion is Q1 2026. Construction is currently at Stage 2E.
Floor plans
Ground and first floor layouts for both the Semi-D Home and Link Villa.
Semi-D Home
Semi-D Home
Link Villa
Link Villa